Hello,
1.3.6.1.4.1.2620.1.1.6.0Â = packets dropped per second
When I run the test against the data source I get what looks like a valid integer back  7874244
Yet my graph looks like this after changing the data source to DERIVE
My graph is attached. Do I need a RRD equation or somethign tot change the scale to valud number?
I have the same issue with packets accepted per seconf oid =Â Â 1.3.6.1.4.1.2620.1.1.4.0
The OS is linux and they happened to be checkpoint splat firewalls.
My other graphs for these are correct.
Ideas? and thank you very much,
Jay
Under graph defintions, manage graph points, do I need some RPN equation?
--------------------------------------------------------------
Reply to this message by replying to this email -or- go to the discussion on Zenoss Community
[http://community.zenoss.org/message/64484#64484]
Start a new discussion in zenoss-users by email
[discussions-community-forums-zenoss--***@community.zenoss.org] -or- at Zenoss Community
[http://community.zenoss.org/choose-container!input.jspa?contentType=1&containerType=14&container=2003]
"problem graphing PacketsDroppedPerSec and AcceptedPerSec"
To view the discussion, visit: http://community.zenoss.org/message/64484#64484
--------------------------------------------------------------
Hello,
1.3.6.1.4.1.2620.1.1.6.0Â = packets dropped per second
When I run the test against the data source I get what looks like a valid integer back  7874244
Yet my graph looks like this after changing the data source to DERIVE
My graph is attached. Do I need a RRD equation or somethign tot change the scale to valud number?
I have the same issue with packets accepted per seconf oid =Â Â 1.3.6.1.4.1.2620.1.1.4.0
The OS is linux and they happened to be checkpoint splat firewalls.
My other graphs for these are correct.
Ideas? and thank you very much,
Jay
Under graph defintions, manage graph points, do I need some RPN equation?
--------------------------------------------------------------
Reply to this message by replying to this email -or- go to the discussion on Zenoss Community
[http://community.zenoss.org/message/64484#64484]
Start a new discussion in zenoss-users by email
[discussions-community-forums-zenoss--***@community.zenoss.org] -or- at Zenoss Community
[http://community.zenoss.org/choose-container!input.jspa?contentType=1&containerType=14&container=2003]